{"product_id":"ups-battery-maintenance-replacement","title":"UPS  Battery Maintenance \/ Replacement","description":"\u003ch2\u003eUPS Battery Replacement Services – Key Scope of Works\u003c\/h2\u003e\n\u003cp\u003eTreske provides a complete, managed UPS battery replacement service using our \u003cstrong\u003ein-house licensed electricians and dedicated project management resources\u003c\/strong\u003e, helping ensure battery replacement works are completed safely, efficiently and with minimal disruption to critical operations.\u003c\/p\u003e\n\u003ch3\u003eKey Scope of Works\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eSite Assessment \u0026amp; Planning\u003c\/strong\u003e – Review the existing UPS system, battery configuration, installation environment, access requirements and operational constraints.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBattery Condition Review\u003c\/strong\u003e – Assess existing battery age, condition, configuration and available historical maintenance\/test information.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProject Management\u003c\/strong\u003e – Coordinate scheduling, site access, safety documentation, equipment, battery logistics and customer communication from planning through to completion.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eElectrical Works\u003c\/strong\u003e – Works undertaken by appropriately licensed electrical personnel, including isolation requirements and electrical connections associated with the battery replacement.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eUPS \u0026amp; Battery Isolation\u003c\/strong\u003e – Establish an appropriate replacement methodology based on the UPS configuration and site requirements, including bypass or isolation procedures where required.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBattery Removal \u0026amp; Replacement\u003c\/strong\u003e – Safe removal of existing battery blocks and installation of new batteries in accordance with manufacturer requirements and approved procedures.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBattery Inspection \u0026amp; Testing\u003c\/strong\u003e – Check individual battery voltage, connections, polarity, physical condition and battery string configuration.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTorque Verification\u003c\/strong\u003e – Battery terminals and interconnections checked and torqued to the applicable manufacturer's requirements.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eUPS Configuration\u003c\/strong\u003e – Review and update battery-related UPS parameters where applicable, including battery capacity, number of strings and replacement\/installation date.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFunctional Testing\u003c\/strong\u003e – Return the UPS and battery system to normal operation and verify correct UPS operation, charging status and absence of battery-related alarms.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCommissioning \u0026amp; Reporting\u003c\/strong\u003e – Provide completion documentation recording battery details, test results, observations and works undertaken.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eAsset Management\u003c\/strong\u003e – Record replacement battery information, installation dates and relevant asset details within the asset management and maintenance records.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eResponsible Battery Disposal\u003c\/strong\u003e – Remove replaced batteries from site and arrange recycling\/disposal through an appropriate battery recycling process.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eOngoing Maintenance\u003c\/strong\u003e – Establish the new battery installation as part of the preventative maintenance program, where applicable, to monitor condition throughout its service life.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eEnd-to-End Responsibility\u003c\/h3\u003e\n\u003cp\u003eFrom \u003cstrong\u003eplanning and electrical works through to installation, testing, commissioning and reporting\u003c\/strong\u003e, Treske provides a single point of responsibility for UPS battery replacement projects—supported by in-house electrical capability, project management and ongoing UPS maintenance expertise.\u003c\/p\u003e","brand":"Treske Pty Limited","offers":[{"title":"\u003c=100km Metro CBD","offer_id":48090392822068,"sku":"install-existing-local","price":0.0,"currency_code":"AUD","in_stock":true},{"title":"Regional","offer_id":48090392854836,"sku":"install-existing-regional","price":0.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0709\/8653\/1124\/files\/Data_Center_Battery_Replacement.jpg?v=1720796476","url":"https:\/\/treske.com.au\/products\/ups-battery-maintenance-replacement","provider":"Treske Pty Limited","version":"1.0","type":"link"}