ECO UPS Electrical Disconnection / Reconnection (Replace Existing)
ECO UPS Electrical Disconnection / Reconnection (Replace Existing) - Business Hours / 1-3kVa / <=60km Metro CBD is backordered and will ship as soon as it is back in stock.
Couldn't load pickup availability
Disconnect/Reconnect 0-3kVA Rack/Tower UPS
- Attend site and set up tools ready to complete works
- Complete JSA/SWMS as required
- Confirm with client to proceed with the disconnection of the existing UPS
- Shut down of existing UPS as per UPS user manual
- Disconnect existing UPS and remove
- Installation of new UPS
- Connect new UPS utilising the existing electrical infrastructure
- Start-up of UPS
- Clean-up site, pack up tools
- Confirm installation with client
- Remove and dispose of old UPS/batteries from site (If required)
Excludes
- Excludes installation of EBM, By-Pass, ATS
- DC Installation works
- Commissioning
- Excludes supply and installation of 240/415V AC circuit
- Excludes delivery of UPS and associated equipment
- Excludes works in excess of 60km from State Capital cities
- Excludes electrical upgrades to submains and distribution boards if required
- Removal of rubbish from site