ECO-UPS Electrical Installation (New Installation)

$1,56000
Taxes, discounts and shipping calculated at checkout.
Treske Pty Limited  |  SKU: Inst2-3UPSNH


Uninterruptible Power Supply (UPS) systems are critical components of modern data centers, providing backup power in the event of a power outage. Electrical installation services for UPS systems include the installation of the UPS unit, as well as any associated electrical wiring and connections. For New Installations ie not replacing an existing UPS

Scope of works

  • Position/Install UPS (Assume UPS is in close proximity of final position)
  • Supply and installation of AC feed from electrical distribution board to UPS location (Maximum 10m distance)
  • Supply and installation of circuit breaker within local distribution board

Electrical distribution board will need to be shut down during installation of circuit breaker and termination of cable. No live work will be carried out.

  • Connect AC supply to nominated UPS
  • Start up of UPS - 2-6kVA only

Please note:

  • All work to be completed during normal business hours Mon-Fri 6.00am to 6.00pm
  • All work completed within 60km of metro state capital cities
  • Please see add ons price list for additional items if required

Exclusions

  • 0-40kVA Startup/Commissioning (Priced Seperately)
  • Time completing site and online inductions if required
  • Site parking fees if required
  • After Hours Mon - Sun 6.00pm to 6.00am, Public Holidays

Contact Us

Speak to Treske to see how we can help you critical infrastructure needs/become more resilient.

Treske Pty Limited

ECO-UPS Electrical Installation (New Installation)

From POA

Uninterruptible Power Supply (UPS) systems are critical components of modern data centers, providing backup power in the event of a power outage. Electrical installation services for UPS systems include the installation of the UPS unit, as well as any associated electrical wiring and connections. For New Installations ie not replacing an existing UPS

Scope of works

Electrical distribution board will need to be shut down during installation of circuit breaker and termination of cable. No live work will be carried out.

Please note:

Exclusions

Hours

  • Business Hours
  • After Hours

UPS Capacity

  • 1-3kVa
  • 5-8kVa
  • 10-20kVa
  • 21-50-kVa
  • 51kVa+

Location

  • <=60km Metro CBD
  • >60km Metro CBD