UPS, Electrical & Data Centre Infrastructure Installation

Planned installations and upgrades for critical power, cooling and supporting infrastructure, with attention to safety, site constraints and operational continuity.

From Equipment Selection to an Operational Installation

A successful installation is more than delivering new equipment to site. Space, electrical capacity, access, lifting, cooling, cabling, shutdown windows and integration with existing systems all influence the work. Treske coordinates suitable equipment and project requirements, helping customers replace ageing assets, add capacity or build out new critical environments.

Installation Capabilities

UPS Systems

New and replacement UPS installations, including equipment positioning, power connections and maintenance bypass arrangements.

Battery Systems

Installation and replacement of UPS battery systems and external battery cabinets to support critical power requirements.

Electrical Infrastructure

Installation of switchboards, distribution boards, PDUs and associated power infrastructure, including circuit and cable works.

Precision Cooling

Installation of precision cooling equipment, associated mechanical infrastructure and improvements to thermal management.

Racks & Cabinets

Installation of server racks, cabinets, accessories, containment and modular data centre infrastructure solutions.

Cabling & Containment

Power and supporting cabling, cable containment, routing and management to support reliable, maintainable installations.

Live-Site Installations

Designed Around the Realities of a Live Site

For an operating facility, the sequence of work matters. We review access restrictions, dependencies, potential interruptions and temporary arrangements before installation begins. Where needed, projects can be staged with agreed cutover plans, responsibilities, contingency measures and testing milestones.

Staging

Coordinate installation phases around site access, live operations and equipment dependencies.

Cutovers

Plan equipment transitions, agreed interruption windows and testing milestones.

Contingency

Identify operational risks, responsibilities and temporary arrangements before work starts.

Our priority is operational continuity. We aim to reduce avoidable disruption through considered planning, while recognising that some installations may require planned downtime.

Planning a UPS installation or upgrade?

Get in Touch

From Installation to Handover

From initial site review and equipment scoping through to coordinated installation, checks and commissioning, Treske helps manage the key stages of critical infrastructure projects.

STEP 01

Scope

Review site requirements, existing infrastructure and equipment needs to define the project scope.

STEP 02

Plan

Coordinate equipment, specialist trades, site access, installation sequencing and shutdown windows.

STEP 03

Install

Carry out coordinated installation works, equipment positioning, connections and integration.

STEP 04

Check

Complete installation checks, review outstanding items and prepare systems for commissioning.

STEP 05

Commission

Coordinate commissioning, acceptance testing and operational handover documentation as required.

Every project is different. The exact delivery stages depend on the agreed scope, from a straightforward UPS replacement to a complex live-site infrastructure upgrade.

Electrical and mechanical delivery through Ecogreen

For relevant works, Treske is supported by sister company Ecogreen Electrical & Mechanical, which provides specialist electrical and mechanical installation capability. Ecogreen holds electrical licences in NSW (258716C), ACT (2018342), QLD (87333), VIC (28548) and WA (EC16054); it is a NECA member and Vertiv Certified Smart Solutions Installer. These are Ecogreen credentials, not licences held by Treske.

Frequently Asked Questions

Can you replace an existing UPS without rebuilding the room?

Often, but capacity, dimensions, bypass arrangements and access must be checked first.

Do you install equipment from different manufacturers?

Treske can source multivendor solutions, subject to technical suitability and approved installation arrangements.

Who carries out licensed electrical work?

Appropriately licensed personnel, including Ecogreen where engaged for the relevant work.